RETURN CLAIM SOP PROCESSING

Created by Level 2, Modified on Thu, 8 Jan at 7:02 PM by Level 2

RETURN CLAIM PROCESSING

Applicable To: Shipfast, GoSwift, Kwikship

Owned By: Operations / Logistics

Goal: Recover losses from courier/aggregator errors with proper evidence and timelines

1. Scope & Definitions

1.1 Return Types

There are ONLY two return flows. Don’t mix them.

  1. Customer Return (CR)
     → Customer initiates return after delivery
  2. RTO (Return to Origin)
    → Shipment undelivered and returned by courier

1.2 Claim Issue Types (Standardized – NO CUSTOM WORDING)

Every return must fall into one of these:

Issue Type

Meaning

Other Product

Wrong / swapped product received

Missing

Product missing or empty package

Damaged

Physically damaged / used / tampered

Lost

Return not received but marked delivered


⚠️ Wrong issue tagging = claim rejection. No exceptions.

2. High-Level Workflow (End-to-End)

Return Received

   ↓

QC Inspection (Same Day)

   ↓

Issue Classification

   ↓

Evidence Collection

   ↓

Aggregator-wise Claim Raising

   ↓

Claim Tracking & Follow-up

   ↓

Closure (Approved / Rejected)

   ↓

Finance Reconciliation

If any step is skipped → claim will fail.


https://docs.google.com/spreadsheets/d/1qq5Diz29l-mjST0b472_pqc5P_3hUKa-ub20wBRkCQY/edit?usp=sharing

3. Detailed SOP – Step by Step

STEP 1: Return Receipt & Logging (T+0)


Owner: Warehouse / Ops

  • Receive return shipment
  • Match:
    • Order ID
    • Return AWB
    • Courier & Aggregator
  • Enter entry in Return Claim Master Sheet  

Mandatory fields to capture immediately:

  • Return Type (Customer Return / RTO)
  • Return Date
  • Aggregator
  • Courier
  • Product SKU & Value

If AWB or Order ID is missing → STOP. Don’t proceed.

STEP 2: QC Inspection (T+0 to T+1)

Owner: QC Team

QC must be done within 24 hours of receipt.

QC Checklist

  • Correct product?
  • Correct SKU?
  • Quantity match?
  • Physical condition?
  • Signs of usage / smell / tampering?

QC Output (MANDATORY)

  • Clear written remark
  • Photo evidence (minimum):
    • Outer packet
    • Inner packet
    • Product
    • Damage / mismatch close-up

? QC remarks must be factual, not emotional.

Bad: “Product bad”
Good: “Used product with odor, stains visible”

STEP 3: Issue Classification (No Guessing)


Owner: Ops

Map QC result to ONE issue type only:

QC Finding

Issue Type

Different SKU / item

Other Product

Item absent

Missing

Torn / used / broken

Damaged

Return not received

Lost


⚠️ Never combine issues in one claim.


STEP 4: Evidence Folder Creation

Owner: Ops

Create one Google Drive folder per AWB.

Folder must contain:

  • QC images/videos
  • Invoice copy
  • Return label
  • Internal QC note (PDF / image)

Folder naming format:

AWB_OrderID_IssueType

Example:

37160012266924_BT383985_Damaged

No proof = auto rejection by all aggregators.

STEP 5: Aggregator-wise Claim Raising

This is where most teams fail. Follow strictly.


5.1 Shipfast

How to Raise Claim

  • Portal → Claims / Support Ticket

Required

  • AWB
  • Issue type
  • Invoice
  • QC images
  • Claim value

Timeline

  • Raise within 7 days of RTO / Return receipt

5.2 GoSwift

How to Raise Claim

  • GoSwift dashboard → Support → Raise Issue

Required

  • Return AWB
  • Order ID
  • Proof link
  • QC remarks

Important

  • Claims after 5–7 days may be rejected


5.3 Kwikship

How to Raise Claim

  • Email + Sheet-based claim (as per SOP)

Required

  • Filled claim format
  • Drive link proof
  • Exact issue wording

Best Practice

  • Always mention:
    • AWB
    • RTO date
    • Claim type in subject line


STEP 6: Claim Recording & Tracking

Owner: Ops

Maintain one master claim sheet.
One row = one AWB = one claim

Mandatory Columns

  • Sl.No
  • Month
  • Date
  • Order ID
  • Return AWB
  • Claim Type
  • Aggregator
  • Courier
  • Product Name
  • SKU
  • Issue Type
  • Value
  • QC Feedback
  • Claim Status
  • Proof Link

Update status every 48 hours.

STEP 7: Follow-Up & Escalation

Owner: Ops Lead

Day

Action

Day 3

First follow-up

Day 7

Escalation

Day 14

Final escalation / closure


No follow-up = no money. Period.


STEP 8: Closure & Finance Reconciliation

Owner: Finance + Ops

  • If Approved:
    • Update claim status
    • Track credit note / payout
  • If Rejected:
    • Record reason
    • Audit internal failure (QC, delay, proof)

Monthly reconciliation is mandatory.

4. Control Rules (Non-Negotiable)

  • No QC → No claim
  • No proof → No claim
  • Late submission → No claim
  • One AWB = One claim
  • Standard issue names only


5. Responsibility Matrix (RACI)

Role

Responsibility

Warehouse

Return receipt

QC Team

Inspection & evidence

Ops Executive

Claim raising

Ops Lead

Escalation

Finance

Recovery & reconciliation


Brutal Truth (Read This Twice)

Most return losses happen not because of couriers, but because internal teams miss timelines or documentation. This SOP removes excuses. If followed, claim success rate goes up sharply.


If you want next:

  • Aggregator-specific SLA table
  • Auto-claim Google Sheet
  • Audit checklist for rejected claims

Say what you want.






Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article